Extension of existing basement into the front of house, including underpinning. The existing front of the house had about one meter of headroom under the floors. The walls required to be underpinned to a depth of three meters then the remaining soil was removed and a new floor formed. Existing cross walls had to be removed and supported by steel at ground floor level. The new room was then waterproofed, lined out insulated and plastered. Giving a fantastic cinema/play room.